Preparing for a RecyClass audit means organising the company's actual system: scope, material flows, suppliers, quantities, quality and evidence. It is not about creating documents solely for the auditor's visit.

How to prepare for a RecyClass audit
Updated:
October 5, 2026
•
2
min read
SOURCE STATUS

Translation of the Polish original, whose sources were editorially reviewed on 28 September 2026. Translation prepared on 5 October 2026; no independent expert approval.

Read in another language:
PolishGerman
AT A GLANCE

Start with a process map and check that each important stage has reliable evidence. The audit should confirm a system that works every day, rather than a set of files assembled at the last moment.

Start by confirming the scope

Before preparing documents, make sure the company knows which scheme, site, process, material, product and any additional module are to be assessed. An unclear scope is one of the most common causes of confusion during an audit.

1. Map the actual material flow

Show the route from the supplier or input waste through receipt, storage and processing to the product, output material or sale. The diagram should reflect what the auditor will see at the site.

2. Check suppliers and input material

  • current supplier certificates;
  • a match between the certificate's site and scope and the purchased material;
  • specifications and purchasing documents;
  • distinction between PCR, PreCR or waste origins, where applicable;
  • rules for supplier approval and reassessment.

3. Test traceability using a real batch

Select an actual delivery and try to trace it through storage, the recipe, production and the finished product. Then test the reverse route: from the finished product back to the material source.

4. Prepare the volume reconciliation

Purchases, inventories, consumption, production, losses, waste, internal regrind and sales should form a coherent picture. Differences do not have to be zero, but they need a credible explanation supported by source evidence.

5. Check quality control

Prepare specifications, test results, inspection frequencies, acceptance criteria and records of how non-conforming material is handled. If an external laboratory is used, its tests and the way the results are used should be clear.

6. Review changes since the previous audit

A new line, supplier, material, site, product, recipe or subcontractor may affect the certification scope. The auditor should receive clear information about significant changes.

7. Review previous non-conformities

If non-conformities were raised, check both whether the individual issue was closed and whether the corrective action was effective. The audit may assess whether the problem has actually been prevented from recurring.

Key takeaway

The best preparation is a system in which processes, data and documents tell the same story. If the organisation can move quickly from a requirement to evidence, and from that evidence to the actual material, the audit runs much more smoothly.

HOW TO USE THIS ARTICLE

Practical guidance grounded in source documents

Use the current scheme documentation and the actual scope of your activities when making decisions about a specific process. Check the dates and sources below.

CHECK THE DATE

Scheme requirements and regulations change. Publication and update dates show which version of the requirements the article reflects.

CHECK THE SOURCE

For RecyClass requirements, consult the current scheme documentation; for legal requirements, the applicable legislation; and for accreditation status, official PCA documents.

APPLY IT TO YOUR PROCESS

The same requirement may have different implications depending on the process, site, material, product, module or scheme version. An article does not replace an individual assessment of the scope.

SOURCES AND REFERENCES

Editorial source review of the Polish original: 28 September 2026.

Primary source: RecyClass Resources — Audit Schemes and scheme documentation.

Before applying the requirements to a specific process, check the current edition of the relevant documents, the scheme scope and any subsequent updates.