A volume reconciliation checks whether material inputs, inventories, production, losses and sales form a consistent picture. Preparing it starts with the actual material flow and reliable source records.

Volume reconciliation: preparing a material balance for a RecyClass audit
Updated:
October 5, 2026
•
3
min read
SOURCE STATUS

Translation of the Polish original, whose sources were editorially reviewed on 2 October 2026. Translation prepared on 5 October 2026; no independent expert approval.

Read in another language:
PolishGerman
AT A GLANCE

Reconcile opening and closing stocks, receipts, consumption, outputs and losses. Each figure must be traceable to source records. This quantitative check is distinct from the mass balance chain of custody model.

What is a volume reconciliation?

A volume reconciliation checks whether material flow data is consistent. At its simplest, it should link the material available during a given period to production, losses, waste and changes in inventory.

In practice, the reconciliation may cover several material types, multiple production lines, transfers between warehouses, subcontracting, internal regrind and the sale of material without further processing.

Volume reconciliation and the mass balance chain of custody model

These concepts are sometimes confused. Volume reconciliation asks whether actual quantities of inputs, stocks, consumption, outputs and losses form a coherent whole. The mass balance model is a separate way of managing a specified characteristic within a chain of custody.

In RecyClass schemes concerned with physical traceability, the actual presence of recycled material and controlled blending in a known proportion are particularly important.

Which data should be prepared?

  • opening and closing inventory;
  • purchases and other material receipts;
  • raw material consumption in production;
  • quantities of products or output materials produced;
  • process losses, waste and by-products;
  • internal regrind and material returned to the process;
  • transfers between sites and warehouses;
  • subcontracted operations;
  • sales of materials and products within the scope.

How does the auditor assess reliability?

The figures must be linked to source evidence. Data should come from the ERP system, warehouse documents, invoices, weighing records, production reports, recipes or other reliable records used by the organisation.

The auditor may sample periods, materials or products and check whether the figures in the reconciliation can be reproduced from the source documentation.

Discrepancies in Recycling Process

The RecyClass Q&A states that an RP balance discrepancy above 5% requires justification for flows that cannot be measured directly, such as moisture or gases. Omitting measurable streams, such as rejects or fines, is a non-conformity and cannot be resolved with a descriptive explanation alone. The 5% threshold is not general permission for traceability gaps or arbitrary losses.

Common errors

  • omitting inventory changes;
  • failing to separate PCR and PreCR;
  • treating internal regrind as a new source of recycled material;
  • omitting losses or by-products;
  • using different units of measurement in source systems;
  • excluding transfers between sites;
  • leaving differences between production reports and sales unexplained.

How should the balance be prepared for an audit?

Start with a map of the physical material flow and then assign a data source to each stage. The spreadsheet then becomes a summary of the system actually operating at the site, rather than a separate document created only for the audit.

Key takeaway

A useful volume reconciliation shows both whether the figures agree and whether the origin of every figure and the fate of the material can be explained reliably.

HOW TO USE THIS ARTICLE

Practical guidance grounded in source documents

Use the current scheme documentation and the actual scope of your activities when making decisions about a specific process. Check the dates and sources below.

CHECK THE DATE

Scheme requirements and regulations change. Publication and update dates show which version of the requirements the article reflects.

CHECK THE SOURCE

For RecyClass requirements, consult the current scheme documentation; for legal requirements, the applicable legislation; and for accreditation status, official PCA documents.

APPLY IT TO YOUR PROCESS

The same requirement may have different implications depending on the process, site, material, product, module or scheme version. An article does not replace an individual assessment of the scope.

SOURCES AND REFERENCES

Editorial source review of the Polish original: 2 October 2026.

Primary source: official RecyClass documentation.

RecyClass, Questions & Answers Certification 2026, p. 13 — document supplied to Almaland. Editorial comparison of the Polish original with the guide: 2 October 2026.

Supplementary source: official scheme documentation.

Recycling Process — scheme documentation. Rule for discrepancies above 5%: Q&A 2026, p. 13.

Before applying this information to a specific process, check the current edition of the relevant documents, the scheme scope and the actual activities.

FURTHER READING

Related articles

ALMALAND
Do you have a question about this topic?
Ask Almaland