← Knowledge base
PPWR and legislation

PPWR technical documentation: how to build a packaging file

PPWR technical documentation should make it possible to assess a specific packaging item against the requirements that apply to it. Clear identification of the product version, technical evidence and change control are essential.

PPWR technical documentation: how to build a packaging file
Updated:
October 5, 2026
•
3
min read
SOURCE STATUS

Translation of the Polish original, whose sources were editorially reviewed on 28 September 2026. Translation prepared on 5 October 2026; no independent legal or expert approval.

Read in another language:
PolishGerman
AT A GLANCE

Professional technical documentation should reflect the actual packaging: its design, materials, suppliers, tests, calculations and assessments must all relate to the same product version.

The basis: Annex VII of the PPWR

Technical documentation must enable assessment of packaging conformity with the applicable requirements. It should not be a collection of unrelated files: its structure must lead from packaging identification to specific evidence.

1. Identify the packaging clearly

Start with the product code or SKU, design version, format, material, target market and intended use. If the documentation covers a family of variants, the grouping rules must be justified.

2. Define the material structure

Prepare drawings and a bill of materials covering the body, closures, labels, sleeves, adhesives, printing inks, barrier layers, seals and other relevant components. Record the material, weight and supplier for each element.

3. Link specifications to suppliers

A general description such as “PET bottle” or “PE film” is usually insufficient. Specifications should match the materials actually used in production and be linked to the correct product version.

4. Identify how conformity is demonstrated

Where a harmonised standard, common technical specification or another method is used, define its scope clearly. If no relevant standard is available, the documentation should describe the solution used to demonstrate conformity.

5. Document the required assessments and tests

Depending on the packaging, relevant evidence may include recyclability assessment, packaging minimisation, reuse, recycled content and the appropriate test reports.

Every report should link to the correct sample and product version. Avoid relying on a test result for an outdated packaging configuration.

6. Introduce version and change management

Changes to the material, supplier, thickness, barrier, label, adhesive or recycled content may affect conformity. The system should identify who approves a change and when reassessment is required.

7. Link the documentation to the EU declaration of conformity

The declaration of conformity should concern the same packaging configuration as the evidence. The manufacturer retains the technical documentation and declaration for 5 years for single-use packaging and 10 years for reusable packaging.

An example folder structure

  • 01 – identification and scope;
  • 02 – drawings and bill of materials;
  • 03 – material specifications;
  • 04 – suppliers and certificates;
  • 05 – recyclability;
  • 06 – recycled content;
  • 07 – minimisation and reuse, where applicable;
  • 08 – test reports;
  • 09 – conformity assessment;
  • 10 – EU declaration of conformity;
  • 11 – change history.

Key point

A complete folder does not itself establish conformity. The value of the documentation depends on whether all evidence concerns the correct packaging, the correct version and the actual production process.

HOW TO USE THIS ARTICLE

Practical guidance grounded in source documents

Use the current scheme documentation and the actual scope of your activities when making decisions about a specific process. Check the dates and sources below.

CHECK THE DATE

Scheme requirements and regulations change. Publication and update dates show which version of the requirements the article reflects.

CHECK THE SOURCE

For RecyClass requirements, consult the current scheme documentation; for legal requirements, the applicable legislation; and for accreditation status, official PCA documents.

APPLY IT TO YOUR PROCESS

The same requirement may have different implications depending on the process, site, material, product, module or scheme version. An article does not replace an individual assessment of the scope.

SOURCES AND REFERENCES

Editorial source review of the Polish original: 28 September 2026.

Primary source: Regulation (EU) 2025/40 on packaging and packaging waste (PPWR) — EUR-Lex.

Before applying this information to a specific product, check the current legislation, applicable delegated and implementing acts and the actual scope of the activities.

FURTHER READING

Related articles

ALMALAND
Do you have a question about this topic?
Ask Almaland