A RecyClass audit step by step

A RecyClass audit combines a documentation review with assessment of the actual process, materials, storage, quantity data and quality control. The detailed sequence depends on the scheme and the organisation's scope.

A RecyClass audit step by step
Updated:
October 5, 2026
•
2
min read
SOURCE STATUS

Translation of the Polish original, whose sources were editorially reviewed on 2 October 2026. Translation prepared on 5 October 2026; no independent expert approval.

Read in another language:
PolishGerman
AT A GLANCE

The audit covers scope confirmation, material flow, traceability, data, quality and a summary of findings. After the required actions are closed, independent review and the certification body's decision follow. Under the cited RecyClass Q&A, the SP, RP and RC process from the on-site audit to certificate issuance must finish within a maximum of 12 weeks.

1. Opening meeting

The auditor confirms the scope, scheme, sites, daily schedule, contact people and how evidence will be provided. This is the time to explain changes since the application or previous audit.

2. System and documentation review

The review covers procedures, responsibilities, supplier qualification, specifications, purchasing documents, warehouse records, production data, quality control and other elements relevant to the scheme.

3. Walk-through of the actual process

The auditor observes material receipt, storage, the processing line, batch identification, flows between stages and output. Documentation should correspond to what physically happens.

4. Traceability test

A selected batch or product may be traced from the supplier to the finished product, or in the reverse direction. The aim is to check whether the system reliably connects material with data.

5. Quantity balance and data

The auditor checks consistency between purchases, inventories, consumption, production, losses, regrind and sales. Different data sources may be compared, with sampling of periods or products.

6. Quality control

The auditor examines required parameters, test methods, results, control frequency, laboratories and procedures for material that does not meet its specification.

7. Findings and nonconformities

If a requirement is not met, the auditor documents a nonconformity with supporting evidence. The organisation prepares actions within the deadlines of the relevant scheme.

8. Closing meeting

The auditor presents the main findings and explains the next steps. They should not promise a certificate before the entire process has been completed.

9. After the audit

Once the required actions are closed, the report and evidence undergo independent review and the certification body's decision. For SP, RP and RC, the entire process following the on-site audit, including certificate issuance, must be completed within a maximum of 12 weeks according to the cited RecyClass Q&A.

Key takeaway

A RecyClass audit is more than a document check. It verifies whether requirements are implemented in the actual process and supported by consistent evidence.

HOW TO USE THIS ARTICLE

Practical guidance grounded in source documents

Use the current scheme documentation and the actual scope of your activities when making decisions about a specific process. Check the dates and sources below.

CHECK THE DATE

Scheme requirements and regulations change. Publication and update dates show which version of the requirements the article reflects.

CHECK THE SOURCE

For RecyClass requirements, consult the current scheme documentation; for legal requirements, the applicable legislation; and for accreditation status, official PCA documents.

APPLY IT TO YOUR PROCESS

The same requirement may have different implications depending on the process, site, material, product, module or scheme version. An article does not replace an individual assessment of the scope.

SOURCES AND REFERENCES

Primary source: RecyClass – Get certified.

Additional source: current Audit Schemes.

RecyClass, Questions & Answers Certification 2026, pp. 7–11, document supplied to Almaland. Editorial comparison of the Polish original with this guide: 2 October 2026.