← Knowledge base
Food contact

RecyClass Module A: requirements for food-contact processes

Module A adds food-contact requirements to the relevant Recycling Process or Recycled Plastics Traceability scope. It is mandatory where applicable; the distinction between A1 and A2 depends on the operations and intended use of the material.

RecyClass Module A: requirements for food-contact processes
Updated:
October 5, 2026
•
2
min read
SOURCE STATUS

Translation of the Polish original, whose sources were editorially reviewed on 2 October 2026. Translation prepared on 5 October 2026; no independent expert approval.

Read in another language:
PolishGerman
AT A GLANCE

Module A can accompany RP or RC. A1 covers final preparation of the input for decontamination, while A2 covers the relevant decontamination scope. A2 excludes novel technologies. Certification does not replace a legal food-contact compliance assessment.

Module A in Recycling Process and Recycled Plastics Traceability

Module A adds requirements to the relevant RP or RC certification, depending on the organisation's operations. The RecyClass Q&A 2026 states that the module is mandatory when it applies to the assessed process and products intended for the food-contact chain. It cannot be obtained as a standalone certificate without the scheme's general requirements.

The A1 and A2 scopes

Current RecyClass documentation distinguishes between A1 and A2, which relate to different process stages. A1 covers the relevant final preparation of material before decontamination, while A2 concerns the decontamination process itself within the appropriate scheme scope.

Suppliers and novel technologies

For RP or RC with Module A2, the Q&A requires suppliers of the relevant input to hold valid certification with Module A1. Module A2 does not apply to novel technologies. For these technologies, the Q&A describes the possibility of a general scope in EU27+3 and A1 requirements for inputs; any derogation must follow from the relevant dossier and be clarified with RecyClass.

Why is the distinction between stages important?

Sorting, pre-processing and decontamination serve different functions. Material can be well prepared for a subsequent process, but preparation alone does not mean that it meets the requirements for the final food-contact application.

What can be assessed?

Depending on the relevant scope, important factors include material origin, input control, process parameters, traceability, operational records, output quality and compliance with the module's additional requirements.

Module A is not a legal authorisation

A RecyClass certificate should not be presented as independent proof that a material fully complies with food-contact legislation. In the European Union, relevant processes and applications are subject to Regulation (EU) 2022/1616 and other applicable legislation.

How should you prepare for the module?

  • clearly define the process stage within the scope;
  • document the origin and control of input material;
  • identify critical process parameters;
  • ensure batch traceability;
  • retain quality control results;
  • distinguish scheme requirements from the operator's legal obligations.

Key point

Module A strengthens verification of a specific process, but the safety and legality of the final application require a full review of the applicable legislation and technical documentation.

HOW TO USE THIS ARTICLE

Practical guidance grounded in source documents

Use the current scheme documentation and the actual scope of your activities when making decisions about a specific process. Check the dates and sources below.

CHECK THE DATE

Scheme requirements and regulations change. Publication and update dates show which version of the requirements the article reflects.

CHECK THE SOURCE

For RecyClass requirements, consult the current scheme documentation; for legal requirements, the applicable legislation; and for accreditation status, official PCA documents.

APPLY IT TO YOUR PROCESS

The same requirement may have different implications depending on the process, site, material, product, module or scheme version. An article does not replace an individual assessment of the scope.

SOURCES AND REFERENCES

Editorial source review of the Polish original: 2 October 2026.

Primary source: Recycling Process Certification.

Supplementary source: Audit Scheme Module A: Food Contact.

RecyClass, Questions & Answers Certification 2026, pp. 21–25 — document provided to Almaland. The Polish original records an editorial comparison with the Q&A on 2 October 2026.

RecyClass Module A, version 1.2 — A1/A2 scopes, input suppliers and novel technologies; the Polish original records comparison with the Q&A 2026.

Before applying the requirements to a specific process, check the current edition of the relevant documents, the scheme scope and any subsequent updates.

FURTHER READING

Related articles

ALMALAND
Do you have a question about this topic?
Ask Almaland